New build
Knockdown rebuild. Master Builders Award winner.
Custom homes and knockdown rebuilds on Sydney's harder blocks.
Piper Moss brings together Stephen's 40 years of building, with estimating and risk-control expertise gained through major NSW infrastructure projects.
Constrained sites, difficult access and steep blocks are normal work for us. You deal with the people who run the job, not an account manager between you and the site.
Ground up residential and commercial work across Sydney's Eastern Suburbs, Inner West and Lower North Shore.
Demolition through to handover on your existing block, managed as one contract.
Ground up construction to your architect's documentation, or to ours.
Delivered lump sum or as design and construct with our own consultants.
Class 2 work, delivered by a builder licensed and registered to do it.
Offices, hospitality and mixed use, including staged work in occupied buildings.
Constrained access, steep blocks and heritage constraints are normal work for us.
On a lump sum contract you bring documentation and we price it line by line. On design and construct we carry the consultants, so one party is answerable for both the drawing and the building of it.
Either way the estimate states its assumptions. Provisional items are named and capped rather than buried in a total that quietly moves once the job starts.
On tight eastern suburbs blocks the constraints are usually access, neighbours and levels rather than the build itself. That is planning work, and it happens before a price is issued rather than after.
We attend site, establish what is actually wrong and put the scope in writing before anyone talks about price.
Priced line by line with the assumptions stated. Provisional items are named and capped, never buried in the total.
Supervised on site, reported weekly, and handed over with documentation, warranties and a defects period we answer.
The five that come up on nearly every new build.
It usually comes down to how much of the existing house you would actually keep. Where the footings, the slab and the structure are sound and the layout you want fits inside the existing envelope, renovating is the cheaper path. Where you are retaining a facade or a single wall to preserve a planning position, the retention itself becomes the expensive part, because everything has to be propped, worked around and tied back into fabric whose condition you cannot fully verify until it is open. We will tell you which one your site is, and we will tell you if it is the one that earns us less.
Either is possible. Where the proposal meets the standards in the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, known as the Codes SEPP, a council or a registered certifier can issue a Complying Development Certificate, which is the faster path. Where it does not, it is a Development Application to the council. Demolition needs its own approval in both cases. Which path you are on depends on the lot, the zoning and the design, so it is worth establishing before the drawings are finished rather than after.
We are, and it is not a matter of goodwill. Under the Home Building Act 1989 (NSW) the statutory warranty runs six years for a defect in a major element and two years for any other defect, measured from completion of the work. Separately, residential building work over $20,000 including GST must carry Home Building Compensation Fund cover through icare, which is the protection that sits behind the builder. Piper Moss is eligible for that cover.
Class 2 is the National Construction Code's classification for a building containing two or more separate dwellings, which in practice means apartment buildings. Under the Design and Building Practitioners Act 2020 (NSW), building work on a Class 2 building has to be carried out by a registered building practitioner, so it is not work an ordinary residential licence covers. Piper Moss holds NSW Builder Licence 497435C and building practitioner registration BUP4255006.
For a lump sum price we need the architectural drawings and any engineering, because that is what makes a line by line estimate possible. For design and construct, a site and a clear brief is enough to begin. Either way we attend the site before issuing a price. On paperwork, in NSW a written contract is required for residential building work over $5,000 including GST, and above $20,000 the contract has to carry considerably more detail, so a build of this size runs on a proper contract as a matter of law rather than preference.
[email protected]
0478 183 300
Mon to Fri 7am to 6pm, Sat 8am to 2pm