Before an owners corporation raises a levy to fix something, it is worth knowing whether somebody else is still on the hook for it. NSW sets three separate periods and they all run from completion. This works out the dates.

For a new building, the date of the occupation certificate. For remedial or renovation work, the date that work reached practical completion. If you are not sure, use the earliest date you can evidence, because that is the conservative one.

The six year period covers a defect in a major element. That is a load bearing or stability essential part of the building. The list is below, and waterproofing is on it, which surprises people.

  • Foundations
  • Walls
  • Roofs
  • Columns
  • Beams
  • Fire safety systems
  • Waterproofing

Whether your particular defect is a major defect in one of these is a legal question, and it is genuinely arguable in a lot of cases. We are not answering it for you here. We are showing you both dates so you know what is at stake either way.

Why we put this in front of the quote.

It is a strange thing for a builder to publish, because it sometimes means the work does not happen.

If a building is five years old and the balconies are leaking, the question of who pays is not settled by getting three quotes. Waterproofing is a major element, so the six year period is very likely still open, and that changes what the owners corporation should be doing first. We would rather tell you that at the start than price a job an owners corporation should not be funding.

Where the periods have closed, at least everyone knows, and the conversation moves on to scope and staging without a year of argument first.

The waterproofing point, specifically.

Waterproofing sits in the major element list alongside foundations and load bearing walls. That is why a balcony or a shower leak often falls inside the six year period when people assume it is a two year item, and it is also why a builder who touches the waterproofing on a balcony takes on six years of exposure for that balcony rather than two.

It is the single most consequential line in the statutory warranty regime for strata buildings, and almost nobody mentions it until there is a dispute.

Not sure what you are looking at?

Send us the defect and the dates. We will tell you what we think, whether or not there is a job in it for us.

[email protected]
0478 183 300
Mon to Fri 7am to 6pm, Sat 8am to 2pm

We reply within one business day.